Nutrient Management Workbook Part 2Nutrient
Management Plan Farmstead Information(If Farmstead Information was already
recorded in Part 1 Nutrient Management Strategy and the Nutrient Management Strategy
and the Nutrient Management Plan are submitted together it is not necessary to
repeat the information here.)
| Name | |
Legal Farm Name | Roll Number | |
Address | | City/Town |
Province | Postal Code | |
County/Region | Municipality |
Lot | Concession | |
Telephone | Fax |
Cell | | Email |
Manure/Nutrient Generator __ Yes __ No | Manure/Nutrient
Receiver __ Yes __ No | Status
__ Owned __ Rented or Leased __ Application Agreement |
Manure
/ Prescribed Material for Application - Type 1Source:
__________ Type: __________ Annual
Amount: __________ gallons / __________ Litres / __________ tons Date
received (if applicable) : ____________________ Operation
Identifier*
of Source (if received from an operation with an identifier assigned by Ministry): ____________________
Analysis N % | NH4-N
(or N03-N) | P % | K
% | Dry Matter % |
| ppm | mg/L | % |
| | | | | | | |
Manure / Prescribed Material for Application - Type 2Source:
__________ Type: __________ Annual
Amount: __________ gallons / __________ Litres / __________ tons Date
received (if applicable) : ____________________ Operation
Identifier*
of Source (if received from an operation with an identifier assigned by Ministry): ____________________
Analysis N % | NH4-N
(or N03-N) | P % | K
% | Dry Matter % |
| ppm | mg/L | % |
| | | | | | | |
Manure / Prescribed Material for Application - Type 3Source:
__________ Type: __________ Annual
Amount: __________ gallons / __________ Litres / __________ tons Date
received (if applicable) : ____________________ Operation
Identifier*
of Source (if received from an operation with an identifier assigned by Ministry): ____________________ *Operation
Identifier - a unique number assigned when NMS has been reviewed.
Analysis N % | NH4-N
(or N03-N) | P % | K
% | Dry Matter % | | ppm | mg/L | % |
| | | | | | | |
Attach extra sheet if there are more types of manure / prescribed
materials for application Nutient Application Summary (Complete
this table following completion of Sections A to R) Liquid
| Field | Date | Type
and Source of Nutrients | Application Method | Incorporation
Method / Date | Application Frequency | Application
Rate | Amount Applied | | | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| Total Liquids Applied | |
Solid
| Field | Date | Type
and Source of Nutrients | Application Method | Incorporation
Method / Date | Application Frequency | Application
Rate | Amount Applied | | | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| Total Solids Applied | |
If manure is only applied once every 2 or 3 years to some fields, additional landbase
is required. Additional Landbase
| Field Name or Number | Identification (ie
Location) | Size (ac) | | | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| Total Additional Landbase | |
Comments_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
The following
documentation must accompany the Nutrient Management Plan. List
of Required Appendices
| Appendix | Title | Attached |
| A | Sign-Off Form1
See Nutrient Management Protocol, Part 15 for the Form | _____
attached | | C | Description
of Operation1 Describe the general operation for which the
strategy / plan is being developed, as well as the size of the operation and the
prescribed material being produced or received. See OMAF NMAN web site for example
descriptions. | _____ attached | | E |
Farm Unit Sketch1 / Field Sketch Attach a farm unit sketch
showing the location and boundaries of the farm unit. Include road names, municipal
boundaries, neighbours and other local features. Include a sketch for each
field in the farm unit identifying the location of all surface water, wells and
non-agricultural land uses within proximity of the field. Show the separation
distances to surface water and wells to meet the requirements of O.Reg 267/03.
Identify the minimum depth to saturated soil conditions, the presence of tile
drains, field boundaries and Field Identifier from the Farm Unit Declaration form.
| _____ attached | | I | Soil
Test Results Include soil test results for all fields identified in the
plan. In accordance with section 91 of O.Reg 267/03 if this is the first NMP for
the operation a soil test for available phosphorus, available potassium and soil
pH may be provided or default values may be used. If this is a subsequent NMP,
soil test values for the available phosphorus, available potassium and soil pH
must be provided. Each soil test should be taken in accordance with the Sampling
and Analysis Protocol and should not cover more than 10 hectares (25 acres) unless
there is evidence that the nutrient content of the field and the management of
the field is uniform. | _____ attached _____
not applicable | | H |
Manure / Prescribed Material Transfers A Nutrient Transfer Agreement
or Broker Agreement accounts for nutrients transferred into or out of the Farm
Unit as outlined in O. Reg. 267/03. | _____ attached _____
not applicable | | J | Contingency
Plan1 A contingency is an event (ie. an emergency) that may
happen, but is not certain to occur. A contingency plan is a document that explains
what would be done in the event that the NMS or NMP cannot be followed. For example,
the storage capacity that the NMS has planned to be available, may get filled
with a heavy rain event before the planned application of manure. The most traditional
contingency event, that everyone must be prepared for is a spill (an unanticipated
release of nutrients). Another contingency is that the field intended for application
is unavailable. A contingency plan is prepared along with NMS or NMP so that
it is ready to be implemented on short notice. Key people in every operation should
be familiar with the contingency plan and how to implement it. | _____
attached | | K | Crop
Yield Documentation Include documentation (ie. crop insurance records)
to support yields for fields where the estimated crop yields exceed the township
(municipality) average by 120%. Include documentation to support yields for fields
with continuous crops where the estimated yield exceeds township (municipality)
averages. | _____ attached _____
not applicable | | M | Manure
Test Results1 Include analysis results from manure / prescribed
material samples. | _____ attached _____ not applicable |
| N | Winter Application Documentation
You have indicated that manure /prescribed materials are being spread between
Dec 1 and Mar 31. Different practices may be required for these applications.
The requirements for winter application under O. Reg. 267/03 are outlined in Part
VI of the regulation. Please indicate how you are meeting these requirements.
| _____ attached _____ not applicable | 1Not
required if the appendix has been included with the Nutrient Management Strategy
- Part 1 of the Workbook Back
to the Nutrient Management Workbook Table of Contents For more information:
Toll Free: 1-866-242-4460
E-mail: nman.omafra@ontario.ca
|