Information for Pigeon Owners
In-Ground Soil Burial
- Water Quality Protection
- No burial allowed on 'AA', or organic soils
- Maximum 2500 kg/hole
- Maximum mortality loading density of 5000 kg/ha/year
- Do not bury again in the same spot for at least 10 years
- Minimum 2 m from the burial hole bottom to bedrock or aquifer
- Minimum 50 m setback to drilled wells with a depth at least 15 m,
and a watertight casing to a depth of at least 6 m below ground level
- Minimum 250 m setback to a Municipal well
- Minimum 100 m setback to any other well
- Minimum 100 m flowpath to surface water, or tile inlets, and located
so as to avoid overland flows
- Minimum 6 m setback to perforated drainage tiles, provided mortalities
are buried at an elevation lower than the bottom of tiles
- Maximum 120 days to leave a hole open until it must be filled &
closed, starting from the time the first mortality is added to the grave,
such as in common graves with mortalities added over time, provided
hole is flagged during filling
- Cap, when full of mortalities, above the original ground level with
soil to a depth at least 50% of original hole depth, but not less than
0.6 m
Protection against vectors
- Minimum 0.6 m of soil at all times over the mortalities
- Minimum 100 m setback to neighbouring permanent Outdoor Confinement
Areas, neighbouring livestock facility, or neighbouring home
- Minimum 30 m setback to nearest road allowance
- Minimum 15 m setback to rear, side or front lot line
Burial holes shall not show signs of scavenging and not be a safety hazard
For more information:
Toll Free: 1-877-424-1300
Local: (519) 826-4047
E-mail: ag.info.omafra@ontario.ca
|