Connecting Procedure
- Check for downed lines
- Check with utility on expected length of outage
- Ensure all connections to outside power sources are disconnected
- Use proper connection cable
- Use proper grounding cable
- Use only approved connectors and receptacles
- Ensure proper alignment of PTO shaft
- Set tractor brakes before operating generator
- Caution: Always locate and operate your generator in accordance
with the manufacturer's instructions as outlined in the operator's
manual.
- For continuous operation, run at no more than 80% capacity
- Keep tractor fully fuelled at all times
- Warning: Consult the generator manufacturer's instructions as
found in the owner's manual before refueling your generator.
- After shut down, store PTO shaft with generator
Start-Up Procedure
- Check all fluid levels
- Connect tractor to generator
- Connect power cable
- Start tractor and adjust PTO speed to proper RPM (either 540 or
1000)
- Place transfer switch in emergency position
- Add loads
- Adjust tractor speed to maintain 60 Hertz
- Monitor voltage and frequency
- After utility power is restored, return transfer switch to normal
- Allow 5 minutes for generator cool down
- Disengage PTO lever
- Remove connector power cable
Exercising the PTO-Driven Generator
- Exercise the PTO generator every 90 days
- Check all fluid levels
- Following start-up procedure, start and run engine for 5 minutes
with no load
- Operate the generator under at least 50% load for 30 minutes
- Check for any abnormalities and remedy as necessary
- Remove load and run at rated speed and no load for a 5 minute cool
down period
- Record results in log

Ensure PTO generator is sized to prevent tip over. (Refer to your Owner's
Manual for detail)
Maintenance Schedule - PTO
Driven Generator Data and Maintenance Performed
1. PTO Gearbox Oil
Component
(as applicable) |
Procedure |
Frequency |
Data & Maintenance Performed |
| Check |
Change
/Clean |
Test |
| a Check |
X |
|
|
E |
|
| b Change |
|
R |
|
S or N = 250 |
|
E = every use; M = monthly; Q = Quarterly; S = semi annually; A = annually;
Numbers = hours of operation; R = replace if necessary
2. PTO
Component
(as applicable) |
Procedure |
Frequency |
Data & Maintenance Performed |
| Check |
Change
/Clean |
Test |
| a Shaft Lubrication |
|
X |
|
E |
|
| b Shields in place/working |
X |
|
|
E |
|
E = every use; M = monthly; Q = Quarterly; S = semi annually; A = annually;
Numbers = hours of operation; R = replace if necessary
3. Generator
Component
(as applicable) |
Procedure |
Frequency
|
Data & Maintenance Performed |
| Check |
Change
/Clean |
Test |
| a Loose/Broken Wires |
X |
|
|
Q |
|
| b Brush length, contact |
X |
X |
|
S |
|
| c Commutator, slip rings |
X |
X |
|
A |
|
| d Rotor and stator |
X |
X |
|
A |
|
| e Bearings |
X |
R |
|
A |
|
| f Bearing Grease |
X |
R |
|
A |
|
| g Exciter |
X |
X |
|
A |
|
| h Voltage regulator |
X |
|
|
Q |
|
| i Resistance of windings |
|
|
X |
A |
|
| j General condition of unit |
X |
|
|
Q |
|
| k Clean Control Panel |
|
X |
|
Q |
|
| l Vacuum Dirt |
|
X |
|
Q |
|
m Cords and Plugs in
good condition |
X |
|
|
E |
|
E = every use; M = monthly; Q = Quarterly; S = semi annually; A = annually;
Numbers = hours of operation; R = replace if necessary
4. Custom Maintenance (itemize below)
Component
(as applicable) |
Procedure
|
Frequency
|
Data & Maintenance Performed |
|
Check
|
Change
/Clean
|
Test
|
| |
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
E = every use; M = monthly; Q = Quarterly; S = semi annually; A = annually;
Numbers = hours of operation; R = replace if necessary
Generator Exercising Log Sheet
Date: ________________________________________________________
Time: ________________________________________________________
Operator's Initials: ______________________________________________
Hour Meter Reading: ____________________________________________
Test Duration (min.): ____________________________________________
Voltage (240 V +/-10): __________________________________________
Amperage: ____________________________________________________
Frequency (60 Hz +/-2): _________________________________________
Oil Pressure (40-60 psi): _________________________________________
Repairs/Service Needed Performed: ________________________________
Note: Logged details and sheets to be filed
and stored for future reference and possible insurance requirements.
Sample Generator Exercising Log Sheet
Date: 01/01/00
Time: 12:01
Operator's Initials: KB
Hour Meter Reading: 310
Test Duration (min.): 37
Voltage (240 V +/-10): 238
Amperage: 40
Frequency (60 Hz +/-2): 60
Oil Pressure (40-60 psi): 50
Repairs/Service Needed Performed: Oil Change, Lube and Filter
For more information: